Transmission Networks & Standards Branch
Papers |
BP No |
Title |
Date |
Author(s) |
|
Transmission Systems Branch |
|
|
1 |
Impedance
Compensation in Metropolitan Exchanges |
Aug-78 |
I
McGregor |
2 |
TELNET
- A Computer Program for Analysis of Telephone Networks |
Sep-78 |
P
M Gregory and I M McGregor |
3 |
Investigations
of a New Call Diversion Apparatus |
Sep-78 |
R
A Seidl |
4 |
The
Use of Primary-Level Multiplex PCM Systems in the DDN |
Sep-78 |
B
M Smith, G J Semple and N Q Duc |
5 |
Development
of an Active Band-Pass Filter |
Sep-78 |
I
McGregor |
6 |
Computer
Optimization of Pulse Shaping Filters in the Time Domain |
Sep-78 |
P
M Gregory |
7 |
A
Note on the Line Signal of a 2048 kbit/s DIV Data Modem |
Oct-78 |
N
Q Duc |
8 |
Further
Studies of Impedance Compensation in Metropolitan Exchanges |
Oct-78 |
P
M Gregory |
9 |
Loop
Error Performance of Some 48 kbit/s Groupband Data Circuits |
Nov-78 |
A
I Domjan, N Q Duc and B M Smith |
10 |
Prediction
of Data Errors from Radio Transmission Parameters (Nullabofr-Wigunda Data
Tests) |
Dec-78 |
R
P Coutts |
11 |
Return
Loss of Magneto Telephones |
Nov-78 |
W
Metzenthen |
12 |
Barrage
Testing at P.C.M. Housings - Philosophy and Practice |
Jan-79 |
L
J Millott |
13 |
The
Protoype Barrage Tester - A Progress Report |
Jan-79 |
L
J Millott |
14 |
Digital
Radio Systems (DRS) Test Results |
Apr-79 |
E
Vinnal |
15 |
Efficiency
of Ear Muffs |
Mar-79 |
E
J Koop |
16 |
A
Microprocessor-Controlled Data Test Set:
Facillities Aspects |
Mar-79 |
N
Q Duc and R B Coxhill |
17 |
Performance
of the Honeywell H-153 Data Modem Operation at 144 kbit/s on Various
Groupband Loops |
Jul-79 |
B
M Smith, N Q Duc and R B Coxhill |
18 |
Loop
Performance of Two 72 kbit/s Groupband Data Circuits |
Jul-79 |
N
Q Duc, R B Coxhill and K S English |
19 |
Evaluation
of a Telettrra V.36 Data Modem and Its Performance over Various Groupband
Loops |
Oct-79 |
R
B Coxhill, N Q Duc and B M Smith |
20 |
Estimation
of Bit Error Rate From Error-Free Second Performance |
Jul-79 |
N
Q Duc |
21 |
A
Summary of Transmission Tests of the Honeywell H-153 Data Modem |
Jul-79 |
B
M Smith, N Q Duc and R B Coxhill |
22 |
Objectives
for the Timing Recovery in a 2048 kbit/s PCM Regenerator |
Sep-79 |
G
Nicholson |
23 |
Proposed
National Specification for an Interface at 2048 kbit/s |
Sep-79 |
G
Nicholson |
24 |
Error
Objectives for Digital Networks |
Nov-79 |
R
A Court |
25 |
DOV
Transmission on 12 MHz FDM Coaxial Cable Systems and Some Out-Of-Band
Measurements on 12, 6 and 4 MHz FDM Coaxial Cable Systems |
Oct-79 |
R
J Morgan |
26 |
Return
Loss Survey - Process in Circuit & System Theory Section |
Oct-79 |
F
Bullock |
27 |
A
Summary of Results on Crosstalk Interference from Primary Level PCM Systems
into Other Systems and Services |
Feb-80 |
J
C Campbell |
28 |
Gain
and Phase Variations of a Broadband Radio System Pilot (Tone) Under Two-Path
Fading Conditions |
Dec-79 |
J
Billington |
29 |
missing |
|
|
30 |
Performance
of Differentially Coherent Quaternary Phase Shift Keying Modulation (DQPSK)
for the Digital Radio Concentrator Systems (DRCS) |
Mar-80 |
J
C N Ellershaw |
31 |
A
Brief Summary of Results of PCM Transmission on Coaxial Cable Interstice
Pairs |
May-80 |
G
J Semple |
32 |
A
Proposed National Sycnhronisation Plan |
Jun-80 |
R
Smith, J Millott and R Morgan |
33 |
Balance
Networks and Stability Calculations in 4-wire Switched PABXs |
Jun-80 |
I
McGregor, R Gray and R Owers |
34 |
Proposal
for an 11 GHz, 140 Mbit/s Digital Radio Field Experiment |
Aug-80 |
A
L Martin, R P Coutts |
35 |
A
Review of the A.W.A. Contract to Develop an MCVD Facility |
Jul-80 |
R
J Morgan |
36 |
Some
Comments Concerning the Application of Optical Fibre Cables in Customer
Wideband Networks for Cable Television Services |
Jul-80 |
R
Morgan, A Quan, R Ayre |
37 |
An
Adaptive Terminating Set for Use in Terminal Exchanges |
Oct-80 |
P
Nicholson, I McGregor |
38 |
Discussion
Paper on Transmission Performance Objectives for Digital Radio Systems |
Aug-80 |
R
P Coutts |
39 |
The
Design of 4-wire Amplified Circuits with Dedicated 2-wire Extensions |
Aug-80 |
I
McGregor |
40 |
Laboratory
Testing of Fujitsu 2048 kbit/s DIV Modems |
Oct-80 |
L
J Millott and T D Stephens |
41 |
A
Hybrid Coil Unit for Connection to Loaded Cable 2-wire Extensions |
Dec-80 |
D
Thom |
42 |
An
Active Circuit for Boosting the Inductance of Isolation Transformers |
Feb-81 |
D
Thom |
43 |
Transmission
Requirements for the VF Interface of an L-Type PCM System |
Mar-81 |
I
McGregor & R Killey |
44 |
missing |
|
|
45 |
Factors
Involved in Satellite Communications System Engineering |
Mar-81 |
R
Horton |
46 |
Digital
Radio Field Experiment Using 6.7 GHz, 140 Mbit/s, 16 QAM Equipment |
Jul-81 |
A
L Martin |
47 |
The
Digital Network Synchronisation Trial - Progress Report 1 |
Apr-81 |
L
J Millott R L Trainor |
48 |
Assessment
of Threshold Extension and Companding Techniques for a SCPC-FM Satellite
System |
Jun-81 |
D
B Albert |
49 |
SLAM
- User Manual |
Jun-81 |
A
Jennings, Chan-Foong andG Galanis |
50 |
Laboratory
Evaluation of the Gandalf SM 9600 D Voiceband Data Modem |
Jul-81 |
L
J Millott and R I Webster |
51 |
Co-Channel
Interference Aspects of the Digital Radio Concentrator System |
Aug-81 |
R
P Coutts, J E Ellershaw, D B Albert |
52 |
Optical
Fibre Networks for Cable Television Distribution - Volume 1 |
Oct-81 |
J
L Adams, G Nicholson and T D Stephens |
53 |
Specification
of Elements of a Synchronisation Network - a Basis for Continuing Study |
Sep-81 |
L
J Millott |
54 |
An
Active Fixed Group Delay Equaliser |
Oct-81 |
R
Owers |
55 |
Impulsive
Noise Calculations for Proposed Electronically Generated Multimetering Pulses |
Nov-81 |
M
Hayes |
56 |
A
Terminating Set Balancing Unit |
Feb-82 |
K
Moseley |
57 |
Analysis
of NEC Report "RF Consideration and Radio Equipment" |
Nov-81 |
J
Ellershaw and A Jennings |
58 |
missing |
|
|
59 |
Crosstalk
- Noise Figure Measurements on Bell PCM 1-544 mbit/s Repeater (Type 238A) |
Dec-81 |
L
W Bourchier, A J Gibbs and G J Semple |
60 |
A
Proposal for a Single-Mode Optical Fibre Field Experiment |
Jan-82 |
R
W Ayre, A J Gibbs, E Johansen and A Y C Quan |
61 |
Wideband
Optical Fibre Distribution Networks - Exec Summary, Vols I-III |
Apr-82 |
j
l Adams, G Nicholson & T D Stephens |
62 |
Circuit
Models for Telephone Network Echo and Stability Calculations |
Apr-82 |
I
McGregor |
63 |
Trans-hybrid
Loss Performance in the Developing Telephone Network |
Mar-82 |
I
McGregor, R Killey |
64 |
The
Prediction of Outage of Digital Radio Systems |
May-82 |
J
C Campbell and R P Coutts |
65 |
UHF
Transmission Measurement of Coaxial Tubes |
Jun-82 |
F
G Bullock |
66 |
Sydney-Melbourne
Coaxial Cable: Performance Predictions from Accelerated Ageing |
Feb-82 |
F
G Bullock, B A Chisholm |
67 |
Digital
Radio Concentrator System Co-Channel Interference Analysis |
Apr-82 |
J
C Ellershaw |
68 |
Transmultiplexer
Techniques |
Apr-82 |
D
B Albert |
69 |
Crosstalk
- Noise Figure Measurements on Bell 3, 152 Mbit/s PCM 48 Repeaters (Types 248
B and 258 A) |
May-82 |
L
W Bourchier, A J Gibbs and G J Semple |
70 |
Tutorial
Programme on Stochastic Processes - Sujpplementary Notes |
May-82 |
B
M Smith |
71 |
Evaluation
of GTE Elastometer Splice Unit and Cutting Tool |
Jul-82 |
R
W A Ayre and D J Semple |
72 |
11
GHz Rain Attenuation Predictions for Sydney and Melbourne |
Jul-82 |
W
S Davies |
73 |
Measurements
of Echo Canceller Performance |
Jul-82 |
D
B Albert |
74 |
140
Mbit/s Digital Radio Field Experiment: Mt. Zero - One Tree Hill Initial
Results |
Jul-82 |
A
L Martin, R P Coutts & J C Campbell |
75 |
missing |
|
|
76 |
Digital
Radio Outage Prediction with Baseband Bit Combining |
Nov-82 |
J
C Campbell |
77 |
Single-Mode
Optical Fibre Systems - Executive Summary of O/seas visit |
Nov-82 |
A
J Gibbs |
78 |
1.5
GHz Digital Radio Concentrator System Interference Study |
Nov-82 |
B
J McGlade |
79 |
Availability
& Performance Objectives of Satellite & Terrestrial Circuits Within a
Digital Network |
Dec-82 |
R
P Coutts, W S Davies, P R Hicks & P G Potter |
80 |
Optical
Communications Research in Japan - Exec Summary of O/Seas visit 5/11/82 -
20/11/82 under Auspices of Japan-Aust Science and Tech Agreement |
Dec-82 |
R
W A Ayre and D J Semple |
81 |
Performance
Comparison of 34 mbit/s 4 PSK, 68 mbit/s 8 PSK and 140 mbit/s 16 QAM Systems |
Dec-82 |
J
C Campbell |
82 |
Signature
Measurements on 140 mbit/s 16 QAM Digital Radio Equipment |
Dec-82 |
J
C Campbell and A L Martin |
83 |
Analog
Network Stability & Echo Improvements for IDN Development |
Feb-83 |
I
McGregor & F Bullock |
84 |
140
mbit/s Digital Radio Field Experiment - Initial Results for 82-83 Fading
Season |
Jan-83 |
J
C Campbell & R A Harvey |
85 |
Impulsive
Noise Simulations for 2048 kbit/s transmission in the subscriber network |
Feb-83 |
P
G Potter |
86 |
Return
Loss Survey: The image impedances and
the formats of the loaded lines |
Apr-83 |
F
G Bullock |
87 |
missing |
|
|
88 |
Using
L-Type PCM with L1 Interfaces at an ARM |
May-83 |
I
McGregor |
89 |
Transmission
and Reflection measurements of an ARF
Exchange above voice frequencies |
Oct-83 |
R
Owers |
90 |
Planned
centimetre and millimetre wave urban radio system field experiements |
Aug-83 |
W
S Davies |
91 |
A
proposal for a wideband telecommunications network in metropolitan areas -
technological considerations |
Jul-83 |
A
Y C Quan & K Lillkingstone-Hall |
92 |
CCITT
Study Group meeting June-July, 1993 - A report of an o/seas visit |
Jul-83 |
R
Smith, J Millott and R Morgan |
93 |
missing |
|
|
94 |
Evaluation
of Ericsson "Mini-Link 13" radio equipment |
Aug-83 |
R
L Reid, R Horton & W S Davies |
95 |
A
proposal for a wideband local network in a retirement village |
Sep-83 |
A Y C Quan |
96 |
The
effect of bridges taps on 2048 kbit/s transmission in the local subscriber
network |
Sep-83 |
A
R Urie |
97 |
Considerations
for an optical wideband local network |
Nov-83 |
G
Nicholson |
98 |
A
survey of development towards digital mobile radio systems |
Oct-83 |
L
J Millott |
99 |
Laboratory
evaluation of a NEC 40 GHz 8 mbit/s digital radio system |
Nov-83 |
R
Reid |
100 |
140
mbit/s digital radio filed experiment - further results |
Nov-83 |
J
C Campbell, A L Martin and R P Coutts |
101 |
The
effect of a notch filter on transmission performance of CCITT REC. V-26 2400
bit/s data modem |
Dec-83 |
R
I Webster & B M Smith |
102 |
Technical
considerations for implementation of high capacity cellular mobile telephone
systems |
Feb-84 |
A
L Martin |
103 |
Recent
reports on loss increase in optical fibres |
Jan-84 |
G
Nicholson |
104 |
Recruitment
for research |
May-84 |
R
Horton |
105 |
Brief
review of current technologies for wideband services |
Feb-84 |
M
J Biggar & A Y C Quan |
106 |
A
comparison of the comuptational strategies for digital reticulation systems |
Jun-84 |
S
V Ahamed |
107 |
missing |
|
|
108 |
missing |
|
|
109 |
A
model for carrier recovery, timing recovery & adaptive equalisation in
high-capacity digital radio systems - I |
May-84 |
P
V Kabaila & J L Adams |
110 |
A
model for carrier recovery, timing recovery & adaptive equalisation in
high-capacity digital radio systems - II |
May-84 |
P
V Kabaila & J L Adams |
111 |
missing |
|
|
112 |
missing |
|
|
113 |
R&D
contracts with AWA for the manufacture of optical fibres |
Nov-84 |
E
Johansen |
114 |
The
nature of local subscriber networks & the status of digital transmission
strategies |
Aug-84 |
S
V Ahamed |
115 |
Achievable
penetrations if ISDN in the Australian loop plant access systems |
Aug-84 |
S
V Ahamed |
116 |
Interference
in a proposed digital satellite network |
Sep-84 |
J
Millott |
117 |
Estimated
transmission limits imposed by nearend crosstalk on Ericsson phase 1B ISDN
digital customer access equipment |
Sep-84 |
L
W Bourchier, G J Semple |
118 |
missing |
|
|
119 |
A
report on the transmission of high speed digital data signs over supergroup
circuits |
Jun-85 |
B
M Smith |
120 |
Status
of video compression technology |
Oct-84 |
R
Horton |
121 |
Considerations
for the use of 1550 NM single mode optical fibre systems |
Oct-84 |
G
Nicholson |
122 |
Assessment
of the EBN adaptive echo cancelling modems for digital loop access |
Nov-84 |
F
G Bullock & R B Coxhill |
123 |
B-MAC
abd the Australian terrestrial relay network |
Jan-85 |
I
M McGregor |
124 |
Digital
selective - calling systems for Royal Flying Doctor Service |
Feb-85 |
W
S Davies |
125 |
Measurement
of the geometrical parameters of single mode optical fibres |
Mar-85 |
B
Goczynski |
126 |
Propagation
assessment of the MARTS computer programme at 900 MHZ |
Jun-86 |
R
A Harvey |
127 |
missing |
|
|
128 |
Local
distribution using optical fibre |
Mar-85 |
I
McGregor |
129 |
Optical
fibre cable ploughing trial - Queensland, Dec 1984 |
Jun-85 |
J
B Carroll |
130 |
Limitation
of mode partition noise on the route design of single mode optical fibre
systems |
May-85 |
G
Nicholson & J C Campbell |
131 |
Free-space
infrared communication |
May-85 |
M J Biggar |
132 |
Mt.
Tanner to Mt. Oberon digital radio
performance prediction using quad - diversity |
Jun-85 |
J
C Campbell |
133 |
An
experimental 64 kbit/sec Viterbi decoder |
Jul-86 |
P
Copeland |
134 |
Atmospheric
infrared communication systems |
Jul-85 |
J
L Adams, P A Thomas, W S Davies |
135 |
missing |
|
|
136 |
Interference
study of digital point-to-multipoint microwave urban radio systems |
Sep-85 |
J
L Adams |
137 |
Optimization
of the local distribution area with the passive coupler optical transmission
system |
Oct-85 |
I
McGregor |
138 |
An
optical fibre transmission system based on passive couplers for the local
look |
Oct-85 |
I
McGregor |
139 |
Measurement
of electromagnetic radiation emitted from a telecom computerphone |
Nov-85 |
S
Iskra |
140 |
Chromatic
dispersion measurement of installed single mode optical fibre cables |
Nov-85 |
T
D Stephens |
141 |
missing |
|
|
142 |
Assessmwent
of transmission aspects of QPSX |
Apr-86 |
P
G Potter |
143 |
Automatic
rain compensation methods with the Aussat beacon |
May-86 |
R
A Harvey |
144 |
Local
Area Network issues |
May-86 |
M
D Hayes & P G Potter |
145 |
Measurements
of the mode partition noise of laser diodes |
Aug-86 |
J
C Campbell |
146 |
Report
on the first meeting of IWP8/13 on future public land mobile systems |
Sep-86 |
R
Coutts |
147 |
Minimum
modal capacity for a wireless office - a traffic study |
Dec-86 |
A
Urie |
148 |
Radio
in the customer access network - bandwidth requirements for ISDN services |
Jan-87 |
G
Bharatula |
149 |
U.H.F.
Propagation in the vicinity of isolated buildings |
Feb-87 |
A
Anderson |
150 |
The
effect of optical feedback on the performance of a commercially available 565
mbit/s optical fibre transmission system |
Mar-87 |
J
L Adams, G Dhosi, R G Hand |
151 |
Data
transmission over the analogue mobile telephone service |
Apr-87 |
P
Green |
152 |
A
perspective on future mobile communications |
Jun-87 |
R
P Coutts and J G Hollow |
153 |
Electrical
hazards presented by some commercial EMI mains filters |
Jul-87 |
Ian
P Macfarlane |
154 |
A
study of the relative cost of providing a mix of customer services over the
customer access using pair cable and optical fibre |
Jul-87 |
G
J Semple |
155 |
Impulsive
noise assessment of a proposed 160 kbit/s WAL1 local access system
(Corrected) |
Jun-87 |
P
G Potter |
156 |
Microwave
wireless office communication systems for ISDN terminals |
Jul-87 |
F
G Bullock & A R Urie |
157 |
Mains-borne
electromagnetic interference from a PABX |
Sep-87 |
Ian
P Macfarlane |
158 |
Broadband
LAN transmission measurements |
Oct-87 |
R
Owers |
159 |
Optical
transmission development for the inter-exchange network |
Sep-87 |
G
Nicholson |
160 |
Notes
on Local Area Network security |
Oct-87 |
M
D Hayes |
161 |
Future
developments in cordless telephones |
Nov-87 |
A
Urie |
162 |
Examination
of 1.8 GHz microwave radio systems against department of defence EMC and EMP
specifications |
Dec-87 |
W
S Davies & I P Macfarlane |
163 |
Recommendations
for application of QPSX technology in the Telecom network |
Dec-87 |
P
G Potter, P A Evans & C J Scott |
|
Transmission
Networks & Standards Branch |
|
|
164 |
Modal
noise aspects of the transmission of 850nm optical signals on 9/125um fibre |
Jun-88 |
R
Masciulli |
165 |
Traceability
of standards of frequency & time |
Jan-88 |
R
Yates |
166 |
ECOC
87 Report on proceedings |
Feb-88 |
T
J Batten |
167 |
Suppression
of electromagnetic interference (EMI) from a digital PABX |
Aug-88 |
I
P Macfarlane & B C Gilbert |
168 |
ISM
apparatus versus mobile radio and cordless telephones in the 900 MHz bands |
Apr-88 |
I
P Macfarlane |
169 |
Field
visit to Croydon district |
Jul-88 |
R
Witham & I McGregor |
170 |
Area
capacity of second generation cordless telephones |
May-88 |
D
Ben-Meir |
171 |
SONET
& Syncbhronous multiplex hierarchies |
Jul-88 |
P
Potter |
172 |
Cordless
extension of cellular mobile telephone systems |
May-88 |
A
Urie |
173 |
missing |
|
|
174 |
Evaluation
of two 12 V DC/240 V AC inverter units |
Jun-88 |
I
Macfarlane |
175 |
An
initial evaluation of earth station antennas for the interra network service |
Jul-88 |
S
J Hurren & D M Farr |
176 |
Evaluation
of RFS Grid kit antenna type GKA 38/1415 |
Jul-88 |
D
M Farr, R J Francis & S J Hurren |
177 |
A
review of optical fibre network architectures for application in the customer
access network |
Jul-88 |
J
Semple |
178 |
A
discussion of optical fibre customer access network scenarios |
Jul-88 |
G
Nicholson |
179 |
A
note on the low cost provision of supplementary exchange lines |
Jul-88 |
B
M Smith |
180 |
Measured
performance of a heavily loaded ethernet LAN |
Jul-88 |
Carolyn
Phiddian |
181 |
Potential
direct internal interference to information technology equipment (ITE) from
multiple collocated basic access ISDN systems |
Jul-88 |
A
Bettikol & S Iskra |
182 |
Assessment
of CANSTAR Super 100 Network |
Aug-88 |
P
Potter |
183 |
Evaluation
of equipment for AM TV transmission over optical fibre |
Oct-88 |
I
McGregor |
184 |
missing |
|
|
185 |
Comments
of draft QPSX specification documents for engineering pilot |
Nov-88 |
M
Warner & P Potter |
186 |
Achieving
electromagnetic compatibility (EMC) in printer wiring boards (PWBs) |
Feb-89 |
S
Iskra & B Gilbert |
187 |
Electromagnetic
suseptibility of Commander F120 analogue keystations |
Jul-89 |
S Iskra |
188 |
Transmission
testing of HP Starlan 10 |
Mar-89 |
R
Jones & P Potter |
189 |
Measurement
systems for assessing optical couplers |
Mar-89 |
D
Gates |
190 |
Assessment of the
electromagnetic |
Apr-89 |
S Iskra |
191 |
Laser
safety in optical fibre systems:
Implications of the new draft Australian Standard on laser safety |
Apr-89 |
R
Ayre |
192 |
Optical
fibre architectures and systems for the customer access network |
Apr-89 |
J
Semple |
193 |
Estimated
CTV switched Star Network costs |
May-89 |
J
Semple |
194 |
Antenna
range measurement of two 890 MHz 3.7 metre grid antennas |
Aug-89 |
E
Vinnal, D M Farr, G J Bail, R J Francis, S J Hurrem & T Jost |
195 |
WDM
over a macnet architecture with a wavelength-dependent multi-port coupler |
Jun-89 |
J
Semple |
196 |
Radiation
pattern measurementr of an 1800 MHz e-plane sectoral horn |
Jun-89 |
G
Bail |
197 |
An
enhanced macnet |
Jul-89 |
I
McGregor |
198 |
System
design options for a passive optical network |
Jul-89 |
G
Nicholson |
199 |
Optical
and radio technologies for future integrated access |
Jul-89 |
B
M Smith & G Bharatula |
200 |
Measurement
of 6.1 GHz high XPD performance antenna |
Aug-89 |
D
M Farr & R J Francis |
201 |
Evaluation
of a JDS variable optical backreflector |
Aug-89 |
R
Witham |
202 |
The
measurement of single mode fused biconical tapered optical couplers |
Aug-89 |
D
Gates |
203 |
Evaluation
of a Deltec model MTA860-4-UN base station antenna |
Sep-89 |
G
J Bail & E Vinnal |
203A |
Evaluation
of the front-to-back performance of a Deltec MTA860-4-UNZ CTMS-base station
antenna 825-896 MHz |
Jul-90 |
D
M Farr & R J Francis |
204 |
Reliability
analysis of a Caesium Clock emsemble |
Aug-90 |
D
Latin |
205 |
Evaluation
of a Celwave/RFS PD1132 CTMS base station antenna 806 to 866 MHz |
Nov-89 |
G
J Bail & S J Hurren |
206 |
Evaluation
of a Deltec model MTA860-8-UNZ base station antenna |
Jan-90 |
S
J Hurren & G J Bail |
207 |
Evaluation
of a Celwave/RFS PD1132 CTMS base station antenna: 860 to 920 MHz |
Nov-89 |
G
J Bail & E Vinnal |
208 |
GKSPLOT:
A graph drawing routine |
Nov-89 |
D
Gates |
209 |
Recommendations
on a 16 or 32-way coupler split for a pay-TV passive optical network:
Overview |
Nov-89 |
G
Nicholson & J Semple |
210 |
Recommendations
on a 16 or 32-way coupler split for a pay-TV passive optical network |
Nov-89 |
J
Semple & G Nicholson |
211 |
Report
on pager construction technology |
Jan-90 |
D
Giddy |
212 |
Measurements
of the incidental radio frequency emissions from an industrial 900 MHz
microwave oven |
Dec-89 |
P
Copeland & M Wood |
213 |
An
initial assessment of the performance of single mode Y junction optical
couplers |
Dec-89 |
B
R Clarke |
214 |
Report
on disassembly of Mobiletronics PC105A technophone |
Dec-89 |
D
Giddy |
215 |
missing |
|
|
216 |
Evaluation
of a Vicom Scalar RA5-60, 825 to 896 MHz, CTMS base station antenna |
Jan-90 |
G
J Bail & S J Hurren |
217 |
Radio
frequency performance of customer premises pair cables - progress report |
Jan-90 |
W
S Davies, B C Gilbert & N Ozergun |
218 |
missing |
|
|
219 |
Evaluation
of optical transmission equipment for multichannel video |
Jan-90 |
N
Wolstencroft & G Nicholson |
220 |
missing |
|
|
221 |
Indoor
radio propagation studies at 1818 MHz with ceiling mounted transmit antenna |
Feb-90 |
G
Bharatula & G Kay |
222 |
Traceability
for Telecom |
Feb-90 |
R
Harris, B Ratcliff & J Erwin |
223 |
missing |
|
|
224 |
A
first discussion on the limits to capacity of cellular mobile radio networks |
Mar-90 |
J
C Campbell & F G Bullock |
225 |
Evaluation
of vertical diversity for cellular mobile radio base stations |
Mar-90 |
J C Campbell |
226 |
Simulation
study of coding schemes on the outbound channel of the Mobilesat system |
Apr-90 |
M
Rahman |
227 |
Electromagnetic
interference (EMI) characteristics of the emergency recall device |
Apr-90 |
S Iskra |
228 |
Evaluation
of two RFS PD1110 omni-directional base station antennas: 820 to 855 MHz and
862 to 898 MHz |
May-90 |
G
J Bail & S J Hurren |
229 |
Workstations
in the wireless office - a traffic study |
May-90 |
D
Giddy |
230 |
High
speed customer premises networks |
May-90 |
M
D Hayes & H S Harper |
231 |
Report
on OTC echo analysis system |
Jun-90 |
D
Latin & F Bullock |
232 |
Evaluation
of the radio-requency shielding effectiveness of ferro-concrete tanks |
Jun-90 |
K
H Joyner & M P Wood |
233 |
Evaluation
of an A.L.S. F.M. video transmission system |
Jun-90 |
S
McKenzie & R Witham |
234 |
Electromagnetic
interference (EMI) characteristics of a combination interface unit for the
special services network |
Jul-90 |
M
Armstrong |
235 |
Evaluation
of a celwave PD10099 CTMS base station antenna: 806 to 896 MHz |
Aug-90 |
D
Francis & S Hurren |
236 |
missing |
|
|
237 |
Wavelength
division multiplexing of multi-longitudinal mode laser diodes on a shared
fibre network |
Jul-90 |
B
R Clarke |
238 |
Electromagnetic
interference (EMI) characteristics of a ±5V switch mode power supply for
mounting on printed wiring boards (PWBs) |
Aug-90 |
S
Iskar & M Armstrong |
239 |
Multiplexing
options for multi-channel transmission over a passive optical multi-star
network |
Sep-90 |
G
J Semple & I M MacGregor |
240 |
Ambient
electric field strength survey performed at the Telecom Industries' bond
store |
Sep-90 |
M
Armstrong |
241 |
Evaluation
of a celwave PD1151 omnidirectional antenna 406-420 MHz |
Oct-90 |
G
Bail, J Rowley & S Hurren |
242 |
Evaluation
of a prototype deltec MTPA 890-4-10 panel CTMS base station antenna: 820 to
960 MHz |
Oct-90 |
S
Hurren & D Francis |
243 |
missing |
|
|
244 |
missing |
|
|
245 |
A
framework for developing standards for an optical customer access network |
Oct-90 |
G J Semple |
246 |
Passive
single-mode optical fibre components |
Oct-90 |
J
Harper |
247 |
The
impact of fibre length on return loss measurement |
Oct-90 |
J
Harper & N Wolstencroft |
248 |
Physical
appraisal and VSWR and return-loss measurement of a deltec Y155-6, 6 element,
148 MHz to 162 MHz Yagi-UDA antenna |
Nov-90 |
G
Bail |
249 |
Physical
appraisal and VSWR and return-loss measurement of a vicom scalar G45T, 500 to
520 MHz omnidirectional antenna |
Nov-90 |
G
Bail |
250 |
Physical
appraisal and VSWR and return-loss measurement of a deltec DA155-2-OD, 148 to
162 MHz omnidirectional antenna |
Nov-90 |
G
Bail |
251 |
Recent
developments in laser safety standards |
Nov-90 |
R
Ayre |
252 |
Evaluation
of two polar 500 MHz Yagi-UDA antennas type 365T and 365TF |
Dec-90 |
R
Francis & G Bail |
253 |
Evaluation
of Grass Valley Group single channel FM optical video transmission system |
Nov-90 |
R
Witham |
254 |
Electromagnetic
compatibility (EMC) characteristics of an RS485 balanced driver/receiver
module |
Jan-91 |
S
Iskra & M Armstrong |
255 |
Investigation
of RFS YU-15G Yagi-UDA antennas 500 - 520 MHz |
Dec-90 |
J
Rowley |
256 |
Simulation
of CT2 interface for wireless PABX and key systems in CBD environments |
Aug-91 |
J
Petridis |
257 |
Evaluation
of a prototype 30 GHz radiometer antenna |
Feb-90 |
D
Farr |
258 |
Transmission
limits in long haul optical amplifier based systems |
Jan-91 |
M
Pettitt |
259 |
Return
losses of Alcatel/STC DIN connectors |
Feb-91 |
J
Harper & N Wolstencroft |
260 |
A
comparison of return loss measurement techniques |
Jul-91 |
J
Harper & N Wolstencroft |
261 |
Measurements
on a GPT telepoint and handset |
Feb-91 |
F
Bullock |
262 |
missing |
|
|
263 |
Evaluation
of a Polar Electronic Industries 314-8-IC omni-directional antenna |
Apr-91 |
G
Bail & J Rowley |
264 |
Measurements
on three telepoints and handsets |
Mar-91 |
F
Bullock |
265 |
Maintenance
and testing of passive optical networks |
Mar-91 |
J
Harper & N Wolstencroft |
266 |
Evolution
of a phase 2 synchronization network |
May-91 |
B
Ratcliff |
267 |
Review
of some antenna techniques to reduce interference between fixed and mobile
services |
Jul-91 |
J
Rowley |
268 |
Optical
amplifiers in the customer access network |
Apr-91 |
M
J Pettitt |
269 |
A
cost effective solution for the near term deployment of FTTH |
Apr-91 |
G
J Semple |
270 |
Radiated
field strength characteristics of 34 and 140 Mb/s QPSX clusters |
May-91 |
S
Iskra & M Armstrong |
271 |
A
DQDB network simulation package |
Jan-92 |
S
Newnham |
272 |
Effect
of block codes on the probability of undetected errors in DQDB segments with
a ten bit CRC |
Jun-91 |
S
Newnham |
273 |
Spectrum
slicing of light emitting diodes for distribution of services over a passive
optical network |
May-91 |
G
J Lampard |
274 |
Interworking
limitations of type A and type B equipment in a SDH transmission link |
Jul-91 |
Pak'Leng
Lui |
275 |
Future
technology options for the interexchange network |
Jun-91 |
R
W A Ayre |
276 |
Electromagnetic
interference (EMI) characteristics of the AXE outage detector |
Jun-91 |
S
Iskra & M Armstrong |
277 |
Performance
of AM video systems using optical amplifiers |
Jul-91 |
M
J Pettitt |
278 |
Potential
applications of sourceless customers in the customer access network |
Jul-91 |
C
Clarke & T Anderson |
279 |
Mobile
channel sounder data logger (Version 2.02) |
Jul-91 |
D
A Jewell |
280 |
Fibre
termination methods |
Jul-91 |
J
Harper |
281 |
AXE
buffer slip calculations |
Aug-91 |
D
Latin |
282 |
Levels
of secuirty for PON access systems |
Jul-91 |
G
J Semple |
283 |
Optical
transmission to the Sydney Regent Hotel MATV system |
Aug-91 |
R
Witham & N Wolstencroft |
284 |
Upgrading
passive optical networks |
Aug-91 |
B
R Clarke |
285 |
An
experimental implementation of a hybrid optical network (HON) |
Aug-91 |
J
Ahrens |
286 |
Initial
investigations into the use of existing copper pair lead-in cable for the
transmission of multi-channel FM video signals |
Aug-91 |
R
Owers |
287 |
Test
report on Fujitsu 2.5 Gbit/s optical transmission system head |
Sep-91 |
R
W A Ayre & G Dhosi |
288 |
The
development of low cost optical line terminal equipment (OLTE) |
Oct-91 |
G
J Semple |
289 |
Proposals
for signal specifications in Austel standards TS006 to control compatibility
crosstalk |
Mar-92 |
P
Potter, B Clarke & I Macfarlane |
290 |
Evaluation
of a vicom scalar 500MHz Yagi-UDA antenna type Y415 S/S. |
Dec-91 |
R
Francis & G Bail |
291 |
Some
outcomes of visit to New Zealand |
Nov-91 |
G
F Jenkinson |
292 |
Radar
signal levels in and around Mount Majura CMTS installation |
Dec-91 |
K
H Joyner & M P Wood |
293 |
Proposed
medium frequency (MF) radio transmitter at Mt Cottril - effect at Mt Cottril
exchange |
Nov-91 |
I
P Macfarlane |
294 |
Technology
options for the Bass Strait crossing |
Dec-91 |
R
Ayre |
295 |
EMI/ECM
treatment for electronic terminals model ET-IV |
Dec-91 |
S
Iskra |
296 |
missing |
|
|
297 |
Verification
of the primary reference clock by common view satellite TV broadcast time
transfer |
Jan-92 |
J
Colvin |
298 |
Electromagnetic
susceptibility characteristics of the TABQ OIS |
Jan-92 |
S
Iskra, D Willis & M Armstrong |
299 |
Enhancing
subscriber line capacity with HDSL and ADSL systems - preliminary review |
Jan-91 |
W
S Davies & N Ozergun |
300 |
Evaluation
of AXE network synchronisation |
May-92 |
J
T Rowley |
301 |
Suitability
of shade cloth for CMTS base station antenna - radome or visual screen |
Apr-92 |
G
Bail & E Vinnal |
302 |
Evaluation
of a prototype deltec MTA925-8-ON, 890-960 MHz, GSM band omnidirectional CMTS
base station antenna |
May-92 |
D
Farr & D Francis |
303 |
Evaluation
of a deltec model MTA925-4-UN 890-960 MHz GSM base station antenna |
May-92 |
R
J Francis & D M Farr |
304 |
Characteristics
of a Philips erbium doped fibre power amplifier |
Apr-92 |
G
J Cowle & F F Ruhl |
305 |
Treatment
of TABQ OIS to improve system immunity to electrical fast transients and
electrostatic discharge |
Apr-92 |
S
Iskra & M Armstrong |
306 |
System
measurements on prototype Philips SDH transmission equipment incorporating an
erbium doped fibre power amplifier |
Apr-92 |
T
D Stephens & G Dhosi |
307 |
Evaluation
of a second prototype deltec MTA925-8-ON, 890-960 MHz omnidirectional CMTS
base station antenna |
Jun-92 |
D
Farr & D Francis |
308 |
Feasibility
of repeaters for GSM coverage in road tunnels |
May-92 |
G
J Lampard |
309 |
Description
of transmission equipment installed for the Melbourne launch of
"Laserlink" |
May-92 |
R
C Witham & N W Wolstencroft |
310 |
Evaluation
of a decibel DB812-Z, 850-960 MHz, omnidirectional CMTS base station antenna |
Jul-92 |
D
Farr & D Francis |
311 |
Evaluation of a celwave PD10183-3, 870-960 MHz,
omnidirectional CMTS base station antenna |
Aug-92 |
D
Farr & D Francis |
312 |
Evaluation
of a decibel DB812-Y, 890-960 MHz, omnidirectional CMTS base station antenna |
Dec-92 |
D
Farr & D Francis |
313 |
Enhanced
immunity to interference - Commander AN |
Nov-92 |
T
Cole |
314 |
SkyLAN
tests |
Jul-92 |
F
Bullock |
315 |
missing |
|
|
316 |
Evaluation
of a decibel, DB812-X 806 to 901 MHz, omnidirectional CMTS base station
antenna |
Feb-93 |
G
Bail & S Hurren |
317 |
Transient
electromagnetic field strengths generated by electrical services in the
exchange environment |
Jul-92 |
I
P Macfarlane, B C Gilbert & A J (Tony) Cole |
318 |
Report
on Pirelli EDFA |
Jul-92 |
F
Ruhl |
319 |
Report
on Corning EDFA |
Jul-92 |
F
Ruhl |
320 |
Radar
signal field strengths on levels 9 and 10, airport central tower, Mascot, NSW |
Jul-92 |
S
Iskra & M P Wood |
321 |
Calibration
requirements for Telecom |
Aug-92 |
R
Harris |
322 |
Traceability
of measurement in Telecom |
Aug-92 |
R
Harris |
323 |
Levels
of radio-frequency radiation for CMTS installations in Sydney Harbour tunnel |
Nov-92 |
K
H Joyner & M P Wood |
324 |
Electromagnetic
interference (EMI) from GSM mobile stations |
Oct-92 |
S
Iskra |
325 |
FASTPAC
performance measurements test plan |
Oct-93 |
V
Manukulasuriya |
326 |
Feasibility
of UHF waveguide TV transmitter feed at Mount Barrow |
Oct-92 |
F
G Bullock & M Taylor |
327 |
missing |
|
|
328 |
FTTCP
filed trial equipment measurements: video performance |
Mar-93 |
B
R Clarke, R Witham & N Wolstencroft |
329 |
EMI
emission measurements from QPSX equipment - customer premises and exchange
cabinets |
Apr-93 |
S
Iskra, M Armstrone & R Camilleri |
330 |
EMC
performance of hospital electronic medical equipment and mobile telephones |
Apr-93 |
K
H Joyner, M P Wood, B Ward |
331 |
missing |
|
|
332 |
Procedures
for performance measurement of FASTPAC network elements |
Oct-93 |
V
Manukulasuriya |
333 |
Compatibility
of GSM mobile phone operation in GMH vehicles |
Apr-93 |
B
Ward, M Wood & K Joyner |
334 |
Compatibility
of GSM mobile phone operation in Mitsubishi vehicles |
Apr-93 |
B
Ward, M Wood & K Joyner |
335 |
Field
strength measurements around GSM car phone glass-mount antennas |
Apr-93 |
B
Ward, M Wood & K Joyner |
336 |
Field
strengths from GSM mobile phones |
Apr-93 |
B
Ward, M Wood & K Joyner |
337 |
Report
on BTD EDFA |
Apr-93 |
F
Ruhl |
338 |
Feasibility
of employing 10base-T technology for proposed FPDX-1 customer switch high
speed extensions |
Jun-93 |
W
S Davies |
339 |
Report
on OTC erbium doped fibre amplifier |
May-93 |
F
Ruhl |
340 |
A
measurement of dispersion limits on an Alcatel 565Mbit/s optical line
terminal (T8-OL) fitted with 1500nm transmitter cards |
May-93 |
George Dhosi |
341 |
Interference
to domestic electronic equipment from GSM mobile phones |
Jun-93 |
B
Ward & S Iskra |
342 |
Environmental
levels of radio frequency radiation at ground level around the Bilgola
plateau CMTS base station |
Jun-93 |
M
Wood |
343 |
FTTCP
field trial equipment measurements: stereo audio performance |
Jul-93 |
B
R Clarke & N Wolstencroft |
344 |
Report
on Philips' OBA-15 EDFA for phase |
Jul-93 |
F
F Ruhl, G Dhosi & R W Ayre |
345 |
Performance
comparison of commercial erbium doped fibre amplifiers |
Aug-93 |
Frank Ruhl |
346 |
Report
of Perth network synchronisation investigation March-June 1993 |
Aug-93 |
B
Ratcliff |
347 |
Overview
of architectures for photonic networks |
Aug-93 |
M
D Hayes, S J Madden, C Desem & P G Potter |
348 |
Evaluation
of two scalar 148 MHz, omnidirectional base station antennas |
Sep-93 |
D
Farr & G Bail |
349 |
SDH
field trial measurement of pointer processor performance |
Dec-93 |
P
Bodeit |
350 |
Timing
performance measurement results for existing and proposed network slave
clocks |
Oct-93 |
A
Hui |
351 |
Survey
of quality of service studies in ANSI, ETSI and ISO |
Nov-93 |
R
Harris |
352 |
Quality
of service and network performance questions for study in the ITU-T, 1993-96 |
Dec-93 |
R
Harris & B Jolley |
353 |
missing |
|
|
354 |
Assessment
of ADSL video switch alternatives |
Dec-93 |
P
Potter |
355 |
CT2
base station and hand-held interference immunity from AMPs and GSM mobile
networks |
Dec-93 |
N
Peavey |
356 |
Preliminary
report - Availability and ITU-T draft recommendation 1.35X "Availability
parameters and objectives for international constant bit rate paths at, or
above, the primary rate" |
Jan-94 |
R
Harris |
357 |
Power
feeding CATV line extenders |
Feb-94 |
R
Owers |
358 |
Critique
on 'Fibre to the home cable television' |
Feb-94 |
M
J Pettitt & J S Harper |
359 |
Calibration
of optical spectrum analysers, and evaluation of wavelength |
Jul-94 |
R
W Pyke |
360 |
Application
of logarithmic or linear corrections, and uncertainties for optical power
measurements |
Jul-94 |
R
Pyke |
361 |
Development
of a wide dynamic range optical power standard |
Jun-95 |
R
Pyke |
362 |
Wander
and jitter at SDH/PDH boundries |
Aug-94 |
Eugene
Zilberg & Duncan Gibson |
363 |
Evaluation
of Celwaer PD220-7, omnidirectional base station antenna |
Aug-94 |
Doug
Farr and Brendan Edwards |
364 |
Investigatory
trip to Siemens- optical amplifier development status for Bass Strait |
Aug-94 |
Frank
Ruhl |
365 |
Calibration
of neutral density filters for optical system instrumentation |
Jun-95 |
R
Pyke & T Doney |
366 |
missing |
|
|
367 |
Digital
transmission over hybrid fibre coax networks |
Feb-95 |
C
Desem |
368 |
Far
field evaluation of a deltec MTPA890-8-MEA, 820-960 MHz CMTS base station
panel antenna |
Jun-95 |
D
Farr & B Edwards |
369 |
Performance
of DECT in the customer access network |
Apr-95 |
M
Hesse |
370 |
Performance
evaluation of radio access in the customer access network using DECT |
Apr-95 |
A
J Guy |
371 |
Evaluation
of Ericsson's DECT system for business and residential portable access
applications |
Apr-95 |
Li
Ping & D Jewell |
372 |
Laser
diodes versus gas spectral lines for optical wavelength calibrations |
Jun-95 |
R
W Pyke |
373 |
Draft
Australian standard on laser safety |
Jun-95 |
R
Ayre |
374 |
?? |
|
|
375 |
?? |
|
|
? |
Evaluation
of a Deltec MTPA 890-4-ME panel CMTS base station antenna |
1990 |
Steve
Hurran, Dick Francis, Geoff Bail & Enn Vinnal |
from here became Mobility Services Programme Branch papers |
|
|
|
|